You can help expand this article with text translated from the corresponding article in Japanese. (May 2020) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Japanese Wikipedia article at [[:ja:マニラ・ライトレール1200形電車]]; see its history for attribution.
You may also add the template {{Translated|ja|マニラ・ライトレール1200形電車}} to the talk page.
The LRTA 1200 class is the third-generation class of high-floor light rail vehicles (LRV) of the LRT Line 1, built by Kinki Sharyo and Nippon Sharyo. Purchased as part of the second phase of the capacity expansion of the line, the trains entered service in December 2006.[9]
On April 7, 2000, the Japan Bank for International Cooperation (JBIC) extended a ₱8.893 billion loan to finance the second phase of the capacity expansion project.[11] While existing rolling stock were refurbished, twelve more four-car trains were purchased, in conjunction with other upgrades in signaling, telecommunications, and existing railway tracks as well as upgrades at stations and the depot.[12]
Two firms bidded for the project: Kanematsu and Kawasaki Steel Corporation, and the joint venture of Sumitomo Corporation and Itochu. Marubeni was disqualified from the bidding but questioned the technicalities of the bidding procedure. However, delays were encountered in the bidding process, with senator Francisco Tatad claiming on March 21, 2004, that "unconfirmed reports" reaching him disclosed that groups identifying themselves with the President of the Philippines (Gloria Macapagal Arroyo at the time) attempted to extort US$1 million from each bidder supposedly as campaign funds for the May 2004 elections. This, according to Tatad, limited the bidders to the two aforementioned firms. His claims were denied by LRTA administrator Pacifico Fajardo, as well as the Department of Transportation and Communications (DOTC; precursor to the DOTr).[13] Fajardo later claimed that JBIC posed "no objection" to the bidding, and said that it was conducted with transparency.[14]
After a delay of more than three years since 2001, Sumitomo and Itochu won the contract and was given the go-ahead in March 2005.[15] Following this, they signed a construction contract with Kinki Sharyo and Nippon Sharyo to manufacture the light rail vehicles.[5][16]
Production and commissioning
In December 2005, officials from the Light Rail Transit Authority and Manila Tren Consortium—the project consultant of the capacity expansion project, inspected the full-scale mock-up model at Kinki Sharyo's factory in Osaka.[17] It was then displayed at the line's depot in Baclaran in March 2006.[18]
After delivery in the third quarter of 2006, the third-generation trains underwent mainline test runs in the late evening, during non-operating hours. Some scheduled tests in late September 2006 were cancelled due to Typhoon Xangsane.[19]
On December 9, 2006, at a ceremony in Baclaran, Japanese Prime MinisterShinzo Abe and President Gloria Macapagal Arroyo inaugurated the third-generation 1200 class trains. These were then deployed for revenue operations two days later.[20] The trains raised the line's capacity from 27,000 passengers per hour per direction to 40,000 passengers per hour per direction.[18]
Themed trains
On September 6, 2018, a 3G trainset was decorated with a special Gabay Guro decoration to celebrate the National Teachers' Month in the Philippines. The decoration has a library-themed look with images of books. The special themed train was launched on that date and ended a year later.[21]
Design
A scale model drawing of the LRTA 1200 class in a 4-car formation
Like the 1100 class, the 1200 class shares the 6-axle rigid body LRV design consisting of two articulated cars.
Car body
The train car body is made of beadless lightweight stainless steel, with composite materials on the indoor panels and aluminum on the inner bone to reduce weight.[5]
Each light rail vehicle has two roof-mounted air-conditioning units that has a cooling capacity of 41,000 kilocalories (170,000 kilojoules). In total, there are eight air-conditioning units in a four-car train set.[22]
A 1200 class train (front cab) at 5th Avenue station in October 2016.
A 1200 class train at Balintawak station in December 2021.
The interior is color-toned based on light and dark two-color green in the seats to complement the landscape of Manila. Seats are made of fiber reinforced plastic and has an aluminum bracket type cantilever longitudinal seat for reducing weight. Seating and grip sticks are designed to have ergonomic dimensions, aside from equipment arrangement inside the cab.[22] A wheelchair-compatible space is provided beside the gangway of the intermediate car, alongside an equipped fire extinguisher.[17]
A single-arm pantograph above the driving car of the 1200 class
Mechanical and braking
Each LRV has three inside-frame bogies, similar to the 1000 class. The bogies consist of two motorized bogies at the ends of the LRV and one shared trailer bogie under the articulation.[5] The primary suspension is a chevron rubber spring, while the secondary suspension is an air suspension, similar to the 1100 class.[24] Semi-permanent couplers are present in the ends of each light rail vehicle except the driving cab section of the MC car.
On June 24, 2010, two trains (1G and 3G) collided at Balintawak station.[25] As a result, LRVs 1248 and 1247 sustained damage. There were plans to restore it,[26] but the involved cars remain idle as of 2022.
On February 18, 2011, two trains (1G and 3G) collided near Roosevelt Station in Quezon City at the reversing tracks, around a kilometer away to the east. There were no passengers on board when the incident happened.[27] This caused the Roosevelt and Balintawak stations to remain closed for two months until the stations were reopened on April 11, 2011. An investigation was conducted and was shown that one of the drivers was texting when the incident occurred.[28] This however caused LRV 1236, the 3G unit involved in the incident, to be in idle state and has not yet been restored for service.
On May 23, 2015, thousands of passengers were stranded after two trains (1G and 3G) collided near the Monumento station. A train driver was hurt after the impact caused his head to slam into the dashboard of the train.[29] The accident, later revealed to be caused by power fluctuation that affected the signalling system, forced passengers to alight from the station until services was restored around 1 pm at the same day.[30]
Build details (original configurations)
All 1200 class trains were designed and built to agreed specifications with no comparable differences.
^"ITOCHU Corporation". Japan Overseas Railway System Association. Archived from the original on August 7, 2020. Retrieved November 27, 2021. In the Philippines, we undertook the Manila LRT Line 1 Capacity Expansion 2 as a JV contractor and we supplied rolling stock and railway systems.
^Castro, Doland (February 18, 2011). "2 LRT trains collide". ABS-CBN News. ABS-CBN News and Current Affairs. Archived from the original on May 26, 2020. Retrieved May 26, 2021.
Japan International Cooperation Agency; Oriental Consultants Co., Ltd.; ALMEC Corporation; Katahira & Engineers International; Tonichi Engineering Consultants, Inc. (July 2013b). "Appendices"(PDF). Study on railway strategy for enhancement of railway network system in Metro Manila of the Republic of the Philippines: Final report, Vol.1 LRT Line 1: Cavite extension project (2013) (Report). Archived(PDF) from the original on December 27, 2021. Retrieved December 27, 2021.