There existed a bridge named Elephant Gate bridge, 89 years old,[4] in between Basin Bridge railway station and Chennai Central railway station above the railway tracks. Near about 10,000 vehicles, during peak hours, crossed this bridge. Due to the weakness of the bridge and to decongest the traffic, the bridge was demolished;[5] and a new bridge, with the length of about 156.12 m is being constructed.[6][7][8] The construction works are carried out by the Greater Chennai Corporation and Southern Railway, Chennai division.[9] The cost of the project is about ₹30 crore and is equally shared by Greater Chennai Corporation and Southern Railway.[10] Still the construction work in progress and likely to get over in August 2025.